1. Construction Update and Look Ahead Schedule
• Project Information Update • Completed To Date • What’s Happening Next 30 Days • Schedule Update • Public Outreach Update • Change Order Report
2. Pool Expansion Update
• Operational & Programming Impacts • Facility Design & Construction Impacts
3. Questions

Construction Update and Look Ahead Schedule PROJECT INFORMATION
Project Completion: Fall 2023 Estimated Cost Completed To Date: 3.2% EarthCam Link: https://share.earthcam.net/RecCenterBuild/rec_center_build/camera/view_1

11-17-2021 3

SAN BRUNO RECREATION & AQUATIC CENTER

Construction Update and Look Ahead Schedule
COMPLETED TO DATE
(Through 10/31/21)
• Pool Building Demolition • Gym Building except building pad • CPT (Core Penetration Test) for Geopier
(Ground Improvement) • Soils Borings for Shot Crete Soils Nail Wall
(shoring) • Recycled: 2,754 tons: concrete, rebar and
debris

11-17-2021 4

SAN BRUNO RECREATION & AQUATIC CENTER

Construction Update and Look Ahead Schedule
WHAT’S HAPPENING NEXT 30 DAYS?
• Tree Removal • Installation of temporary by-pass water line • Start Grading and shoring

11-17-2021 5

SAN BRUNO RECREATION & AQUATIC CENTER

Construction Update and Look Ahead Schedule

SCHEDULE UPDATE

Progress Line

2021

2022

2023

Q2 Q3 Q4

Q1 Q2

Q3

Q4

Q1 Q2 Q3

Q4

PHASE 1A: Demo, Grading,

Demo

Site

Shoring and Site

PHASE 1B: Pools

Pools

PHASE 1C: Building

Building

PHASE 2A: City Park Way
PHASE 2B: City Park Way
PHASE 2C: City Park Way PHASE 3: Crystal Springs
Road PHASE 4: Parking Lot

Creek Street Realignment
Utility
Utility
Parking Lot

11-17-2021 6

SAN BRUNO RECREATION & AQUATIC CENTER

Construction Update and Look Ahead Schedule PUBLIC OUTREACH UPDATE

11-17-2021 7

SAN BRUNO RECREATION & AQUATIC CENTER

Construction Update and Look Ahead Schedule
CONSTRUCTION CHANGE ORDER REPORT
1. Change Order In Process a. Additional removal and disposal of hazardous material (PCB/Asbestos containing materials) b. Temporary by-pass water line to maintain fire flow (proposed Water Fund)
2. Change Order Under Review a. Sidewalk Improvement to improve pedestrian access from Desoto Road and parking lot to Park (proposed Park-In-Lieu Fund) b. Additional hauling and dump fee for the contaminated concrete pad
3. Potential Change Order a. Pool Expansion from 6 to 8 Lanes

11-17-2021 8

SAN BRUNO RECREATION & AQUATIC CENTER

POOL EXPANSION UPDATE | Operational & Programming Impacts
Operational and Programming Impacts
• Overview of Design and Standards • Programming • San Bruno Recreation and Aquatic Center Pool Design • Operational Impact

11-17-2021 9

SAN BRUNO RECREATION & AQUATIC CENTER

POOL EXPANSION UPDATE | Pool Design

CURRENT DESIGN 6 Lane Outdoor Pool

San Bruno Aquatic Center Design
• Designed as a multi-use Recreation Pool • Programs are inclusive of all skill levels • Ability to support a diverse set of programs • Ability to accommodate competitions
Main Outdoor Pool
• 25 yards (short course) • 6 lanes • 7’ wide lanes
Outdoor Wading Pool
• 24’ x 45’ • 0-depth entry • Maximum depth 1’ • Splash and spray features

11-17-2021 10